{"product_id":"hi-limit-w-long-lead-man-reset","title":"Raypak High Limit Manual Reset Kit with Long Lead for 992 to 2342 Heaters, 007144F","description":"\u003cp\u003eThe Raypak 007144F is a high limit manual reset kit with a long lead wire, rated from 100 to 240 degrees F, for Raypak commercial pool heater models 992, 1262, 1532, 1802, 2002, 2072, and 2342.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eWhat it does\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eA high limit switch shuts the heater burner down if the water temperature exceeds a safe operating limit, protecting the heat exchanger from overheating. The Raypak 007144F is the manual reset version, so the switch must be reset by hand after it trips, and it uses a long lead wire to reach its mounting point.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eFit and compatibility\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eThis kit fits Raypak commercial pool heater models 992, 1262, 1532, 1802, 2002, 2072, and 2342, and is rated across a 100 to 240 degrees F range.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eBefore you order\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eConfirm your Raypak heater model number is on this list before ordering, since Raypak commercial heaters use more than one high limit switch design across the model lineup.\u003c\/p\u003e","brand":"Raypak","offers":[{"title":"Default Title","offer_id":48693980528852,"sku":"RAY-151-1330","price":157.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0801\/9568\/2516\/files\/default_e8333a1a-1f93-4751-ae8d-936027aa8052.jpg?v=1789765488","url":"https:\/\/www.activepoolsupply.com\/products\/hi-limit-w-long-lead-man-reset","provider":"Active Pool Supply","version":"1.0","type":"link"}