CMI EB2100 2 ft by 100 ft equipotential bonding grid kit with split bolt and metal stakeCMI 2' x 100' Equipotential Bonding Grid Kit, EB2100$69999
CMI EB2100 2 ft by 100 ft equipotential bonding grid kit with split bolt and metal stake

CMI 2' x 100' Equipotential Bonding Grid Kit, EB2100

Ask a questionMPN EB2100
$69999
FREE Delivery

30 day returns · Easy, with prepaid labels provided

Quick overview

  • 2 ft by 100 ft One roll covers 200 square feet of the bonding band around the pool.
  • Welded #8 solid copper Exothermically welded joints on a 12 inch grid, so every crossing is a solid bond.
  • Kit included A JRD rebar clamp, #8 split bolts for the corners and the clamp, and 16 metal stakes.
  • One person install The stakes hold the grid down so a single installer can roll it out.
  • Made for a 12 inch beam With a 12 inch beam at the pool edge, the 2 ft roll reaches 3 ft out from the water.
  • Built to NEC 680.26 CMI states the grid meets the equipotential bonding section of the National Electrical Code.
Full description and specifications ↓

Need a hand?

Bilingual support from pool professionals.

Send us a message

A pool professional will get back to you, usually the same business day.

About CMI 2' x 100' Equipotential Bonding Grid Kit, EB2100, SKU GEP-57-5205. We will include it with your message.

We use your details to answer this message and nothing else.

Frequently bought together

Current item CMI 2' x 100' Equipotential Bonding Grid Kit, EB2100
CMI

2' x 100' Equipotential Bonding Grid Kit, EB2100

$69999
Shade Science Pool Buoy Floating Pool Umbrella, 5'7" Adjustable Shade with 5 Cup Holders, Black and White Stripe, PB-16011-BW
Shade Science

Pool Buoy Floating Pool Umbrella, 5'7" Adjustable Shade with 5 Cup Holders, Black and White Stripe, PB-16011-BW

$24900 Web Price Some manufacturers don’t allow us to publicly display their best prices online. When you request an Unadvertised Deal, you’re asking us to unlock a special offer that isn’t shown on the site.
Get your unadvertised price ›
Pool Buoy Floating Pool Umbrella with Cup Holders, Harbor Blue, PB-16011-HAR
Shade Science

Pool Buoy Floating Pool Umbrella with Cup Holders, Harbor Blue, PB-16011-HAR

$21900 Web Price Some manufacturers don’t allow us to publicly display their best prices online. When you request an Unadvertised Deal, you’re asking us to unlock a special offer that isn’t shown on the site.
Get your unadvertised price ›
Poolguard In-Ground Pool Alarm, PGRM-2
American Granby

Poolguard In-Ground Pool Alarm, PGRM-2

$25199
S.R. Smith 20" U-Frame Fulcrum Cover, FC-200A-R
S.R. Smith

20" U-Frame Fulcrum Cover, FC-200A-R

$6499
S.R. Smith 6' Cantilever Complete Diving Board & Base, Radiant White, 68-209-5962
S.R. Smith

6' Cantilever Complete Diving Board & Base, Radiant White, 68-209-5962

$1,87699
National Stock Sign Co. 41" x 47" Texas Pool Rules Sign, Plastic, TX4148
National Stock Sign

Co. 41" x 47" Texas Pool Rules Sign, Plastic, TX4148

$10899
Subtotal

Product details

The CMI EB2100 is an equipotential bonding grid kit: a 2 ft by 100 ft roll of #8 solid copper on a 12 inch grid, with every joint exothermically welded, and the hardware to install it. It goes under the paved deck around a pool and is tied into the pool's bonding, so the deck, the water and the metal around the pool sit at the same electrical potential.

What is in the kit

The grid roll, a JRD rebar clamp UL listed for two #8 bond wires, #8 split bolts to join the corners and tie each side to the clamp for direct burial, and 16 metal stakes. The stakes hold the grid flat while it unrolls, so one person can lay it.

Choosing the width

The grid runs 3 ft out from the inside edge of the pool. With a 12 inch beam at the pool edge, the 2 ft wide EB2100 completes that 3 ft. With a narrower beam, CMI calls for the 3 ft wide EB3100. Each EB2100 roll covers 200 square feet.

Code

CMI states the grid meets section 680.26 of the National Electrical Code, the section on equipotential bonding for pools. It is installed at the construction or deck replacement stage, before the concrete goes down, and the bonding should be made by a qualified electrician and inspected to the local code.

Specifications
Brand CMI
Manufacturer part number EB2100
UPC 783935958225
Type Equipotential bonding grid kit
Size 2 ft x 100 ft
Coverage 200 sq. ft.
Conductor #8 solid copper, exothermically welded
Grid spacing 12 in.
Included Grid roll, JRD rebar clamp, #8 split bolts, 16 metal stakes
Placement Under the paved surface, 3 ft out from the inside edge of the pool
Use with A 12 in. beam at the pool edge; use the 3 ft wide EB3100 with a narrower beam
Code NEC section 680.26, per CMI

Request a quote

Need a volume price, a freight quote, or pricing in writing before you order? We reply the same business day.

Request a quote

Customer reviews

Questions and answers

What people ask about this product, answered by our pool techs.

Should I use the 2 ft EB2100 or the 3 ft EB3100?
It depends on the beam at the pool edge. CMI's instructions say that with a 12 inch beam, the 2 ft wide EB2100 gives a total of 3 ft of bonded surface out from the edge of the pool. With a beam narrower than 12 inches, CMI calls for the 3 ft wide EB3100 instead.
What comes in the EB2100 accessory kit?
The kit has one JRD rebar clamp, UL listed for two #8 bond wires, #8 split bolts to connect the corners of the grid and tie each side to the rebar clamp for direct burial, and 16 metal stakes that hold the grid in place while it is rolled out.
What is the EB2100 grid made of?
#8 solid copper, laid out on a 12 inch grid with every joint exothermically welded. A welded joint is fused rather than clamped, so the crossings stay bonded under the deck.
Why use a bonding grid rather than a single copper wire around the pool?
CMI's position is that a grid extends the equipotential plane across the whole perimeter band, while a single wire only bonds along its own line. Which methods are accepted is decided by the local electrical code and your inspector, so check with them before the deck is formed.
Can one person install the EB2100?
Yes. The 16 stakes in the kit hold the grid down as it unrolls, so a single installer can lay it. It goes under the paved surface, 3 ft out from the inside edge of the pool, and is connected to the rest of the pool's bonding before the deck is poured. A qualified electrician should make the connections and have them inspected.
Does the EB2100 meet the National Electrical Code?
CMI states the EquiBond grid meets section 680.26 of the NEC, the section that covers equipotential bonding for pools. Many states adopt the NEC with their own amendments, so confirm the local requirements with your inspector.
Ask your own question