
Raypak High Limit Manual Reset Kit with Long Lead for 992 to 2342 Heaters, 007144F
30 day returns · Easy, with prepaid labels provided
Does it fit your equipment?
Your model:
Quick overview
- High limit manual reset A Raypak high limit switch kit with manual reset and a long lead wire.
- Temperature rating 100 to 240 F Rated across a 100 to 240 degrees F operating range.
- Fits Raypak 992 to 1532 models Fits Raypak commercial pool heater models 992, 1262, and 1532.
- Also fits 1802 to 2342 models Also fits Raypak commercial pool heater models 1802, 2002, 2072, and 2342.
- Long lead wire Built with a long lead wire for the high limit switch connection.
- Genuine Raypak part Manufactured by Raypak, part number 007144F.
Need a hand?
Frequently bought together

High Limit Manual Reset Kit with Long Lead for 992 to 2342 Heaters, 007144F
Similar products
Other products people compare with this one.
Raypak 11 kW Electric Heater Element Kit with Gasket for ELS 1102-2 Pool Heaters, 001802F$18599
Raypak High Wind Stack with Adapter for Model 156A Pool Heater, 014719$15899
Raypak Genuine OEM 2 inch CPVC Adapter Kit for 155B/C, R185 and R265 Versa Pool Heaters, 005393F$8699
Jandy High-Limit Temperature Sensor for JXi 200, 260 and 400 Heaters, R0592300$8599
Raypak Ignitor Direct Spark Kit for AVIA Heaters, 018874F$8599
Raypak Unitherm Governor Kit for AVIA Heaters, 019062F$9099
Jandy Laars Temperature Sensor Kit with Sleeve and Gasket for JXi, LXi and Legacy Heaters, R0456500$13999
Raypak Burner for 992, 1262, and 1532 Pool Heaters, 007617F$8209
Raypak Complete Control Bezel for 206A, 266A, 336A and 406A Digital Heaters, 013491F$17099
Raypak Water Flow Switch for Crosswind Pool Heaters, 018146F$14599
Raypak Water Unions and O-Ring for Crosswind Pool Heaters, 018155F$15799
Raypak Genuine OEM Natural to Liquid Propane Conversion Kit for 156A Copper Pool/Spa Heater, 014915F$20399
Jandy Gasket and Seals Kit for Model 200, 260, 400 JXi Heaters, R0589500$9899
Raypak Auto Limit Kit 150F, 018304F$8699
Jandy VersaFlo Flue Sensor Kit for Jandy Pro Series JXi Heaters, R0719400$15399
Jandy Refractory Replacement Kit, Internal, for JXi Heaters, R0590500$14099
Raypak Element Tube Assembly Kit for ELS 0018 and ELS 0027, 017140F$21199
Hayward Blue Bezel and Keypad Assembly with Door for Universal H-Series Low NOx Heaters, FDXLBKP1932$20999
Raypak Indoor Stack Top, 7 in., for 266 and 267 Heaters, 009839$22999
Raypak Indoor Stack Top 9 in. for 406K and 407K BTU Heaters, 009841$18099
Product details
The Raypak 007144F is a high limit manual reset kit with a long lead wire, rated from 100 to 240 degrees F, for Raypak commercial pool heater models 992, 1262, 1532, 1802, 2002, 2072, and 2342.
What it does
A high limit switch shuts the heater burner down if the water temperature exceeds a safe operating limit, protecting the heat exchanger from overheating. The Raypak 007144F is the manual reset version, so the switch must be reset by hand after it trips, and it uses a long lead wire to reach its mounting point.
Fit and compatibility
This kit fits Raypak commercial pool heater models 992, 1262, 1532, 1802, 2002, 2072, and 2342, and is rated across a 100 to 240 degrees F range.
Before you order
Confirm your Raypak heater model number is on this list before ordering, since Raypak commercial heaters use more than one high limit switch design across the model lineup.
| Brand | Raypak |
|---|---|
| Manufacturer part number | 007144F |
| UPC | 840891005995 |
| Type | High limit manual reset kit with long lead |
| Temperature rating | 100 to 240 degrees F |
| Fits models | Raypak 992, 1262, 1532, 1802, 2002, 2072, 2342 commercial pool heaters |
| Shipping weight | 2 lb |
| Ships | Parcel |
Request a quote
Need a volume price, a freight quote, or pricing in writing before you order? We reply the same business day.
From Raypak
Raypak heaters
Raypak Pool Heater, 399K BTU, Natural Gas, Digital Ignition, Copper Heat Exchanger, 0-2000 Ft. Elevation, P-R406A-EN-C, 009219
Raypak 266K BTU Natural Gas Pool Heater, Digital Ignition, Copper Heat Exchanger, 0-2000 Ft. Elevation, P-R266A-EN-C, 009217
Raypak Crosswind V Heat Pump, 138,000 BTU, with Titanium Heat Exchanger and Digital Controls, TWPH-8550EHT08
Raypak 156A 150K BTU Above Ground Pool and Spa Heater, Digital Controls, Electronic Ignition, Natural Gas, 0-4999 ft Elevation, 014784
Genuine Raypak parts
Raypak Genuine OEM Protek Shield Module Assembly, 017960F
Raypak Kit-PC 3-Wire Board Controller IID for 206A-408 Pool Heaters, 100-10000345
Raypak Genuine OEM Propane and Natural Gas Pilot, 002003F
Raypak Genuine OEM 3/4" IID Pool Heater Natural Gas Electronic Valve, 003900F



Customer reviews
More from Raypak
Raypak Heat Pump Digital Control Board 9350/9353 5450-8450, 100-10000347$30299
Raypak Genuine OEM Protek Shield Module Assembly, 017960F$5099
Raypak Crosswind V Heat Pump, 138,000 BTU, with Titanium Heat Exchanger and Digital Controls, TWPH-8550EHT08$5,14200
Raypak 156A 150K BTU Above Ground Pool and Spa Heater, Digital Controls, Electronic Ignition, Natural Gas, 0-4999 ft Elevation, 014784$2,64900
Raypak Genuine OEM 3/4" IID Pool Heater Natural Gas Electronic Valve, 003900F$21699
Raypak WeatherKing 118K BTU Heat Pump 6560 with Powder-Coated Steel Cabinet and Digital Controls, TWPH-6560EHT01$3,53400
Raypak Kit-PC 3-Wire Board Controller IID for 206A-408 Pool Heaters, 100-10000345$32499
Raypak Pool Heater, 399K BTU, Natural Gas, Digital Ignition, Copper Heat Exchanger, 0-2000 Ft. Elevation, P-R406A-EN-C, 009219$4,42600
Raypak 266K BTU Natural Gas Pool Heater, Digital Ignition, Copper Heat Exchanger, 0-2000 Ft. Elevation, P-R266A-EN-C, 009217$3,37400
Raypak Analog Natural Gas Above Ground Pool Heater 105,000 BTU, P-R106A-AN-C, 014779$2,11900
Raypak Boiler Burner 10-Pack, 100-10000414$4099
Raypak Inlet/Outlet Header Complete with ProTek Shield, 017959F$43099
Raypak Genuine OEM Propane and Natural Gas Pilot, 002003F$8299
Raypak 100K Temp Sensor Kit, 9350/9353 and 5450-8450 Heat Pumps, H000329$10899
Raypak Burner Tray with Burners for 406A Pool Heaters, 010394F$77299
Raypak Genuine OEM Copper Tube Bundle 266/267, 010060F$69499
Raypak 266A Polymer Cu-Ni Tube Bundle, 014931F$1,36999
Raypak 11kW 240V E3T Electric Heater ELS-D-0011-1-Ti, 017122$1,15400
Web Price
Raypak Burner Tray with LP Burners Pro (Sea Level) for Heat Exchanger Models 399 and 406A, 019209F$32199
Raypak AVIA 399K BTU Natural Gas Low NOx Pool Heater with WiFi, HD Nitek Tubing, 0-10,000 ft Elevation, P-R404A-EN-N, 018045$4,92300
Questions and answers
What people ask about this product, answered by our pool techs.
What does the Raypak 007144F control?
Which Raypak heaters does the 007144F fit?
Does the 007144F reset automatically?
Is the 007144F sold as a complete kit?
Get your unadvertised price ›






